Welcome to the detailed manual for the installation, use, and maintenance of LV High Current Transformer Bushings, a unique product with a capacity of 20000 Amp and built specifically for systems up to 36 kV. This manual is intended to ensure that your transformer bushings operate at their peak efficiency and last as long as possible. Yash Highvoltage Ltd is dedicated to giving you the best equipment possible.
Installation Instructions:
Preparation: Make sure all relevant safety measures are in place before installation. Verify that the bushings meet the requirements of your system.
Alignment: Be sure to properly align the bushings with the transformer's or other device's recommended installation locations.
Mounting: Use the right hardware to firmly attach the bushings, and make sure the correct electrical connections are made.
Sealing: Use strong sealing techniques to keep impurities and moisture from impairing the performance of the bushings.
Torque: To avoid over- or undertightening, pay close attention to prescribed torque values when installing.
Operation Guidelines:
Load Considerations: To avoid overheating or performance deterioration, be sure that the transformer bushings are operated within their specified current and voltage specifications.
Temperature Monitoring: During operation, check the temperature of the bushings frequently to look for any unusual temperature increases that might point to problems.
Isolation Testing: To check the insulation's integrity and find any potential problems, perform isolation resistance tests on a regular basis.
Voltage Gradients: In order to achieve uniform distribution and avoid stress concentration, keep an eye on the voltage gradients across the bushings.
Corona Discharge: Check for corona discharge on a regular basis because it can result in partial discharge and shorter bushing lifespan.
Maintenance and Inspection:
Cleaning: Keep the bushings free of debris that could harm them and impact their function.
Visual Inspection: Check the insulation or housing of the bushing on a regular basis for any indications of cracks, damage or degradation.
Corrosion Prevention: Take action to stop metallic component corrosion, especially in situations with high moisture levels.
Seal Integrity: To ensure moisture resistance and guard against interior damage, periodically inspect and maintain the seals.
Records Keeping: Keep a thorough record of all maintenance tasks, examinations, and test outcomes for future study and reference.
You may increase the effectiveness, dependability, and durability of your LV High Current Transformer Bushings by carefully according to these installation, operation, and maintenance instructions. Please don't hesitate to get in touch with the technical support team at Yash Highvoltage Ltd if you need any help or have any questions.
Yash Highvoltage Ltd is still dedicated to your success and safety, giving you the best tools and in-depth advice along the route.